WWF-VIET NAM-CALL FOR PROPOSALS (RE-ADVERTISEMENT): "PRE-FEASIBILITY STUDY FOR WILDLIFE CORRIDORS OF TUY LOAN-LA SON HIGHWAY IN BACH MA NATIONAL PARK" FY24-1611 BCA
Posted on 26 June 2024
Tender Ref. FY24-1611 BCA; Tender package: "Pre-feasibility study for wildlife corridors of Tuy Loan-La Son highway in Bach Ma National Park".
WWF-Viet Nam, USAID Biodiversity Conservation would like to invite Consultants who are interested in our tender package: "Pre-feasibility study for wildlife corridors of Tuy Loan-La Son highway in Bach Ma National Park".This time, we adjust the ToR in order to find suitable consultant.
Please see the attached file for detailed information.
HOW TO APPLY:
Please send the electronic proposal to WWF-Viet Nam’s designated mailbox at gam.phamthi@wwf.org.vn; duc.dominh@wwf.org.vn; chuong.buiphuoc@wwf.org.vn and trang.phamthu@wwf.org.vn. Your e-mail must have the subject heading as “HSDX-[Consultant’s name]- FY24/1611 BCA "Pre-feasibility study for wildlife corridors of Tuy Loan-La Son highway in Bach Ma National Park".
The maximum size per email that WWF-Viet Nam can receive is 25MB.
The deadline for submission is 17:00 (Hanoi ICT) on July 09th, 2024.